2000 BESSER ULC2
Price:Call

Buy
2000 BESSER ULC2
Used and New
Description:
10’ x 12’ truck dump hopper w/ grizzly.
24” x 160’ (24” truss frame) bin-feed conv w/ walkway w/ handrail, gravity take-up, supports, belt cover, and elec motor.
(4) 50-ton square feed bins w/ dual discharge gates on each bin. Each bin measures app 12’0” (L) x 12’7” (W) x 24’0” (H). 4-bin shuttle conv system distributes material into the bins. Walkways on both sides of the shuttle w/ handrails and access ladders. Walkway w/ handrails and stairway along under-bin conv. (The feed bins and structure components (beams, braces, etc.) are bolted together and each piece seems to be marked for easy reassembly.)
30” x 65’ under-bin conv w/ elec motor, Rice Lake Weigh System, and (4) receiving hoppers.
24” x 30’ channel frame transfer conv w/ receiving hopper, elec motor, and supports.
(2) 60-ton cement silos w/ discharge auger.
(1) 40-ton cement silo w/ discharge auger.
This system was designed and installed by the Besser Company for a block manufacturing facility. The purchaser will be responsible for disassembly and removal of all of the components.
For additional information and pictures, contact Jeff Schenck (M/ 317-840-8904).
24” x 160’ (24” truss frame) bin-feed conv w/ walkway w/ handrail, gravity take-up, supports, belt cover, and elec motor.
(4) 50-ton square feed bins w/ dual discharge gates on each bin. Each bin measures app 12’0” (L) x 12’7” (W) x 24’0” (H). 4-bin shuttle conv system distributes material into the bins. Walkways on both sides of the shuttle w/ handrails and access ladders. Walkway w/ handrails and stairway along under-bin conv. (The feed bins and structure components (beams, braces, etc.) are bolted together and each piece seems to be marked for easy reassembly.)
30” x 65’ under-bin conv w/ elec motor, Rice Lake Weigh System, and (4) receiving hoppers.
24” x 30’ channel frame transfer conv w/ receiving hopper, elec motor, and supports.
(2) 60-ton cement silos w/ discharge auger.
(1) 40-ton cement silo w/ discharge auger.
This system was designed and installed by the Besser Company for a block manufacturing facility. The purchaser will be responsible for disassembly and removal of all of the components.
For additional information and pictures, contact Jeff Schenck (M/ 317-840-8904).
Information:
Year | 2000 |
1